DVGW G 469 PDF

Technical Rule – Code of Practice. DVGW G (A) |June Pressure testing methods for gas transmission/gas distribution. DVGW G – DVGW G Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE and PE-Xa) -. Technical rule [WITHDRAWN] Article is not orderable. DVGW G Compression strength test for pipelines and facilities of gas supply.

Author: Kazrajin Daisida
Country: Madagascar
Language: English (Spanish)
Genre: Career
Published (Last): 10 October 2013
Pages: 315
PDF File Size: 1.20 Mb
ePub File Size: 3.2 Mb
ISBN: 958-7-67514-135-6
Downloads: 66064
Price: Free* [*Free Regsitration Required]
Uploader: Mautaxe

Pressure test

Determines the amount of air still in the pipeline. The pressure loss may amount to:.

The pressure test must be carried out in compliance with the requirements laid down in the relevant rules and regulations, e. The pressure test is carried out in a maximum of three steps.

The pressure must be brought back to the test level at regular intervals and in any case after a drop of 0. The pressure loss may amount to: Carry out as specified by the planner Main test: It is carried out over a period of 3 hours for pipes up to DN Drucken Teilen Xing Twitter.

  CITIBANK MALAYSIA REWARDS CATALOGUE 2015 PDF

Pressure tests must be carried out by qualified personnel with the relevant knowledge of pipeline engineering, the execution of pressure tests, the measurement techniques and the applicable safety regulations. Each pipeline must be subjected to a pressure test after it has been laid.

This applies in particular to pipelines with mechanical socket connections. The pipeline is to be tested over its entire length or, if necessary, in sections. To stabilize the pipeline section when the soil has finally settled and the cement-mortar lining has absorbed sufficient water.

The main test is a test of the entire system, and in particular gg the watertightness 4699 proper execution and installation of the pipes, fittings, etc.

Water absorption in the cement-mortar pores may initially cause a drop in pressure even if the pipeline is completely watertight. Before the pressure test can be carried out, the pipeline must be covered with backfill material so as to avoid shifts in position, which could cause leaks.

  DISTRIBUTED SYSTEM SINGHAL SHIVRATRI PDF

There are two basic test methods: The test sections must be defined so that: For this reason it is advisable to carry out the pressure test over a period of at least 24 hours.

Hydrostatic testing — CEPS a.s.

The joints need not be covered by backfill. Before starting the test, the pipeline must be slowly and evenly filled with water at a rate of about 0.

The test sections must be defined so that:. The water loss method fvgw DVGW Worksheet W can be used as an equivalent alternative to the pressure loss method described above.