HUAWEI CDMA BTS 3606 PDF

Default Re: Huawei CDMA E BTS Max Power??? HI I think it can be more than 20W because the RF board support MAX 60W. The 3rd Global CDMA Operation and Development Forum, themed. To illustrate this further, we can note that Huawei BTSCE power With Huawei latest CDMA BTS products, based upon the physical network. indoor type) and BTSAC (for outdoor type) are The complete series of CDMA BTSs, and relevant Thus, for the same traffic in a sector, a Huawei BTS.

Author: Kagarn Tutaur
Country: Solomon Islands
Language: English (Spanish)
Genre: Love
Published (Last): 7 September 2017
Pages: 303
PDF File Size: 18.70 Mb
ePub File Size: 19.87 Mb
ISBN: 724-3-31694-482-3
Downloads: 69304
Price: Free* [*Free Regsitration Required]
Uploader: Domuro

Place the support below the antistatic floor.

Page of 93 Go. Lead the cables into their corresponding cable-fixing troughs.

Wooden cases are generally used to pack heavy objects like racks, batteries, and so on. Thus, you do not need to install these cables on site. The alarm box is correctly installed according to the design. Fix them onto the units. Connect one end of the cable to the working ground of the EAC. Enter text from picture: They are used for the convenience of installation description. Figure Installing a board 2 Tighten the screws clockwise on the front panel, as shown in Figure Conducting Insulation Test To conduct an insulation test, proceed as follows: Leveling the lower support See section 2.

  JAN FRIES HELRUNAR PDF

Huawei BTS3606 Installation Manual

The cabinet is placed upside down. Indoor centralized rack icr dual-mode base station pages. Installing the Lower Support To install the lower support, proceed as follows: Installation Method You need to prepare the U-bar support on the site.

Comments to this Manuals Your Name. Connect the two probes to the paint-free place of the base and the expansion bolt.

CDMA grows greener – Huawei Publications

Tighten the bolts at the front face of the cabinet. Determine the length of the grounding cables according to their actual cabling path, that is, the route from the binding post of BTS cabinet huawej the wiring holes of the grounding protection bar of the cabinet. Mouse operation Action Description Press and hold the primary mouse button left mouse Select button by default.

The letters A, B, C as shown in Figure are not fdma labels.

If the outer package is damaged or soaked; or the equipment is soaked and becomes rusty, stop unpacking and find the cause. Other Cables The power cable and the grounding cable are routed straight and bundled neatly. For the 24 V power input, the voltage drop of the cable huaawei the 24 V power supply system to the power input port of the BTS must be less than or equal to 0.

  EL HEMATOCRITICO DE ARTE PDF

Please feel free to contact our local office or company headquarters. To print the manual completely, please, download it. That is, 1 m 39 in. The engineering supervisor does not submit self-test report on quality of the engineering hardware. Determine the installation location for the DDF according to the engineering design for the equipment room. Otherwise, the equipment will suffer severe damages. Route the alarm cables coming in from the other side of the enclosure through the cabling holes on both sides of the 8-E1 module and then to the respective slots.

GND cables for indoor cabling racks and for outdoor cabling racks. Page 43 5 M6x20 combined screw Figure Installing a cabinet on the antistatic floor Figure shows how to install a BTS cabinet on the floor without sufficient bearing capacity.

Normally, the fan box is installed upon delivery. Note, Comment, Tip, Knowhow, Thought: