KEMPEROL 2K PUR PDF

KEMPEROL 2K-PUR is a two-component, UV-stable high performance seamless and self-terminating cold fluid-applied polyester reinforced solvent-free. KEMPEROL 2K-PUR Speedshot combined with KEMPEROL 2K-PUR is the ideal solution for all applications where speed is essential. These include balconies. KEMPEROL® 2K-PUR is a solvent-free and odourless, fully reinforced, polyurethane resin-based liquid waterproofing system. It is ideal for use on sustainablility.

Author: Brarisar Toran
Country: Namibia
Language: English (Spanish)
Genre: Health and Food
Published (Last): 16 August 2013
Pages: 359
PDF File Size: 5.5 Mb
ePub File Size: 7.79 Mb
ISBN: 706-2-23759-853-5
Downloads: 31308
Price: Free* [*Free Regsitration Required]
Uploader: Taugis

Mechanically fasten wood nailers as required to resist a force of lbs per lineal foot, but kem;erol no less than 5 fasteners per kemprol foot or 6 fasteners per 10 foot length of nailer. Job start inspection at the beginning of each phase of the project, to review special detailing conditions and substrate preparation.

Any incidents of water entry shall be evaluated and all necessary repairs conducted, followed by an additional flood test until all repairs are completed successfully.

Roof liquid waterproofing – KEMPEROL 2K-PUR – KEMPER SYSTEM – Videos

Kemperol Surfacing Sand 0 18 0. Fit plywood to all penetrations, projections, and nailers. Manufacturer’s data sheets on each product to be used, including:. Do not thin primer. Any surface to be leveled or filled kemperll first be primed with an appropriate primer. Upon request k2 the Architect or Owner, submit Manufacturer’s written approval of secondary components in list form, signed by an authorized agent of the manufacturer.

Suitable for landscaped applications where a direct topping of soil or other growing media with semi-intensive-type vegetation such as grasses and wildflowers will be pud.

Secure the drainage mat in place by placing temporary ballast on top of the drainage mat. After 48 hours at 73 degrees F, 50 percent relative humidity with rubber pneumatic tires. By pru We have thousands of BIM objects from a variety of manufacturers so take a look now. Acceptable gooseneck material is copper, of a sheet weight appropriate for the application. Voids require the installation of backer rod or other backing material prior to application of the polyurethane joint sealant.

  ESTARAS AHI GUILLAUME MUSSO PDF

Provide with drainage channels within the pedestal base. Install a strainer basket to prevent debris from kfmperol the drainage line. Complete all previously noted punch list items prior to the scheduled meeting. Expanded, closed-cell polyethylene foam designed for use with cold-applied joint sealant.

Note that all insulation requires cover board. The versatility and adaptability of all Kemperol membranes, combined with the professional technical support, delivers a long term, built-to-last solution for any waterproofing challenge. Neatly fit cap sheet to all penetrations, projections, curbs, and walls. Following the initial embedment, cover the top fleece surface of the expansion joint material with a second 13 inch strip of Kemperol membrane, overlapping the fleece portion of the expansion joint, the first layer of Kemperol membrane and terminating on the field substrate.

Primer, resin, and fleece mixing and pr methods as specified for field membranes are also suitable for membrane flashing.

Do not install products under environmental conditions outside manufacturer’s absolute limits. Supports for electrical conduit and gas lines greater than 1 inch in diameter require the use of a separate engineered support system.

Secondary products that are required shall be as recommended and approved in writing by the waterproofing system manufacturer.

Inspect substrates, and correct defects before application of new waterproofing. Coordinate with installation of drains as shown on Drawings, including flashing, and associated waterproofing work. Materials must be kept dry at all times. Concrete shall be abrasively cleaned in accordance with ASTM D to provide a sound substrate free from laitance. Insulation shall be feathered or tapered to provide a sump area a minimum of 36 inches by 36 inches where possible at all drains.

2o to gypsum-based panels, cementitious stucco, synthetic stucco, wood or metal siding or coping, and other similar materials is not acceptable. Ke,perol insulation, cover 2o and polyurethane adhesive manufacturers’ recommendations for the appropriate adhesive application rate and application procedure.

Wood nailers shall be firmly fastened to the deck. Warranty inspection to confirm completion of all punch list items, surfacing, and overburden application.

KEMPEROL 2K PUR

Place the drainage mat fabric side up on top of the finished waterproofing membrane. Notify the membrane manufacturer of job completion and schedule a final inspection date. Sealing of doorways, windows, and skylights with duct tape and polyethylene sheeting pjr prevent leakage of kempwrol into the building. Install only as much insulation as can be covered with overburden or otherwise secured in place before the end of the day’s work or before the onset of inclement weather.

  EMINENCE LEGEND CB158 PDF

Primed substrate surface shall be dry, with any remaining dust or loose particles removed using clean, dry, oil-free compressed air, industrial vacuum, cloth-wipe or a combination. Submit manufacturer warranty and ensure forms have been completed in Owner’s name and registered with manufacturer.

Kemper System Ltd Web: Accelerator to be used with cream resin Component A prior to mixing of multi-component resin. In addition to cleaning, all metal surfaces shall be abraded to provide a rough open surface.

California Waterproofing Supply Kemperol 2K-PUR

Cold roofs Flat roofs Green roofs Warm roofs. Non-woven polyester fabric, minimum 4. A surface moisture content of under 5 percent is required to allow for proper primer penetration into the substrate.

Reference FM approvals for kemprol application patterns that satisfy FM wind uplift requirements. Erection and use of moveable enclosure s sized to accommodate work area s and stationary enclosure for resin mixing station.

Mix thoroughly for approximately 2 minutes with a clean spiral agitator without creating any bubbles or streaks. Overlap fabric in the direction of water flow.

Exhaust opening shall be sealed with activated carbon filter. Pavers, tiles, stone ballast, or wood decking shall be installed in accordance with the overburden manufacturer’s current published specifications and recommendations for use in an above-membrane plaza application. Warranties range from limited materials warranties to limited materials and labor warranties with coverage for insulation, ballast, vegetated overburden and surfacing.

Monitor surface and ambient temperatures, including the effects of wind chill. If kmperol is necessary, provide complete protection of affected areas.